Location:Applications--refrigerated container
refrigerated container

When taking PU or PF as insulating material, the heat reserving period is only 1-2 days; after applying VIP, the insulating period can be prolonged to 4-5 days. Therefore, the transportation cost can be significantly reduced by land transportation instead of air transportation